



Approaching the house, there's a lot of concrete, we know I'm game immediately. To get to the front door one must ascend either the concrete steps or ramp to the first level from the driveway similar to the Woodie Garber home in Glendale.
The house offers many photogenic moments which I took full advantage of prior to CF3 members arriving.
The structure of the house is a combination of concrete, steel and wood. Large I-Beams cantilever from the structure to carry the balconies. The cable railing is hardly noticable lending transparency to accent the cantilevered planes.
Doing all this remediation in our small back yard proved a fun challenge to use every square inch of space to allow the wood fill to dry. Two rounds of patch, sand, patch, sand, prime and we were ready for reinstall.
Here's yours truly getting busy priming up on the ladder. The right side of the house is pictured with the newly fascia install. I did have to mix in a couple of new 20' sticks of 1x10 and 1x8 to replace some of the super rotted sticks that we couldn't salvage. Having given the roofers notice they could install the final coping, time was limited to finish the rest of the roof.