Wednesday, August 3, 2011
MCM Jim Alexander on Oregon Trail
Thursday, June 9, 2011
Eames Armshell Restoration Project
Doesn't it look right at home?
Monday, April 18, 2011
Time to RSVP Your Miller Residence Tour
photo courtesy of IMA Sometimes, it has been said, the best things in life come in threes. In 1953, the combination of Eero Saarinen, Dan Kiley, and Alexander Girard created one of the finest examples of residential modernism, the Miller House. Debuting for public touring starting May 10, the house will be available to the public after several years of meticulous care by the Indianapolis Museum of Art. There is no doubt the house, interiors, and its surrounding gardens represent the epitome of Mid Century Modernism at its best.
I was fortunate enough to tour the house last spring along with other bloggers on the now legendary Columbus blogger tour. From the geometric landscape to the sunken conversation pit to the atomic awesome thoroughness of the house, there's no doubt a tour will rock you to your modern soul. If you're local, it's less than 2 hours away, there are no excuses. CF3 is currently setting up their group tour set for mid July. For more info, be sure to visit the Columbus Indiana website for more info and to book a scheduled tour now.
Friday, October 22, 2010
CF3 Coffee Chat - Adam / Goetz Residence
Approaching the house, there's a lot of concrete, we know I'm game immediately. To get to the front door one must ascend either the concrete steps or ramp to the first level from the driveway similar to the Woodie Garber home in Glendale.
The house offers many photogenic moments which I took full advantage of prior to CF3 members arriving.
The structure of the house is a combination of concrete, steel and wood. Large I-Beams cantilever from the structure to carry the balconies. The cable railing is hardly noticable lending transparency to accent the cantilevered planes.
Monday, October 18, 2010
DIY Chimney Crown Repair
Tuesday, October 5, 2010
Fairwell Red, We're Going Gray
Doing all this remediation in our small back yard proved a fun challenge to use every square inch of space to allow the wood fill to dry. Two rounds of patch, sand, patch, sand, prime and we were ready for reinstall.
Here's yours truly getting busy priming up on the ladder. The right side of the house is pictured with the newly fascia install. I did have to mix in a couple of new 20' sticks of 1x10 and 1x8 to replace some of the super rotted sticks that we couldn't salvage. Having given the roofers notice they could install the final coping, time was limited to finish the rest of the roof.
Since priming, color has become the big debate around the house. The argument is partially around that the primer light gray looks kind of good, so I had to reconfirm our intentions with a little Photoshop action to the left. Intentions confirmed. Saturday, August 14, 2010
Ultimate Mid Century Modern Swap - Part 1
Sunday, August 8, 2010
Mid Century Modern Curb Appeal - Red Roof
Sunday, July 18, 2010
Mid Century Modern Flat Roof Replacement - Day 2
The two most critical areas of a flat roof are the flashing and transition details. Part of day 2 would entail the connection of the roof to the massive brick chimney. Previously the roof was just draped up to brick.
Looking the other way, the crew is busy setting plywood over the insulated area. After the 3/4" T&G plywood is installed, 1" polyisocyanurate insulation board is mechanically fastened to the plywood deck before the new EPDM is glued to the insulation board.
A view of the critical transition of the 'flat' roof over our kitchen to the sloped roof. You can see many things going on in this photo. The old fascia cover peeled away reveals the existing redwood fascia with the existing membrane roof draped up to a termination bar fastened to the fascia. Needless to say, a very hideous condition.
To the left, the new rubber flashing condition at the chimney. This looks super clean compared to the previous debacle. Addition splice layers double up the strength and durability of this connection. Note the new perimeter dam of the roof edge. After perimeter flashing is installed, this will keep the roof from overflowing on the remediated fascia.